Energy Translator
Energy language without the fog
Search the language on a bill, contract or proposal. Each explanation says what it means, where it appears, why it matters and what to ask next.
This is general information, not a reading of your contract or bill. Check the wording that applies to your organisation before acting.
33 terms found
A
- AMR — Automated Meter Reading
- A meter that automatically sends consumption readings to a supplier or data service.
- Where you may see it: Metering arrangements, bills and data reports.
- Why it matters: Regular actual readings can reduce estimated bills and make unusual consumption easier to spot.
- A useful question: How often is data collected, who receives it, and can we access it?
- AQ — Annual Quantity
- An annualised gas-consumption quantity associated with a supply point.
- Where you may see it: Gas supplier data, quotations and industry records.
- Why it matters: It helps suppliers price expected volume but may lag a material operational change.
- A useful question: When was the AQ updated and does it reflect current occupation and equipment?
C
- Capacity charge
- A charge linked to the electrical capacity reserved for a site, rather than only the energy consumed.
- Where you may see it: Electricity bills for larger sites, sometimes described alongside agreed or available capacity.
- Why it matters: A site may pay for capacity it no longer needs, or incur charges if it exceeds its agreed level.
- A useful question: What capacity are we paying for, what peak do we use, and who can change it?
- CCL — Climate Change Levy
- A tax applied to energy supplied to many UK businesses and public-sector organisations.
- Where you may see it: Electricity and gas invoices, usually as a separate line.
- Why it matters: Eligibility, reliefs and the accuracy of the taxable quantity can affect the bill.
- A useful question: Which supplies attract CCL, and is any relief or exemption relevant to us?
- Commodity cost — wholesale energy cost
- The part of an energy price associated with buying the electricity or gas itself, before network, policy and other non-commodity elements.
- Where you may see it: Quotation breakdowns, procurement reports and market commentary.
- Why it matters: A fall in wholesale prices does not imply that every component of the delivered business bill falls by the same amount.
- A useful question: Which part of this offer is commodity, when was it priced and which other elements remain variable?
D
- Deemed contract
- An energy arrangement that can arise when a business uses energy without agreeing a contract with the current supplier.
- Where you may see it: A new, moved or acquired site where no supply contract was put in place.
- Why it matters: Deemed rates can be substantially more expensive and usually need active action to leave.
- A useful question: Are any sites on deemed rates, and what notice or evidence is needed to move them?
- DNO — Distribution Network Operator
- The regional company that operates the local electricity network carrying power to a site.
- Where you may see it: New connections, capacity changes, outages and generation projects.
- Why it matters: The DNO is not normally your supplier, but its network and connection decisions can constrain a project.
- A useful question: Which DNO serves the site and is a connection or capacity application needed?
- DUoS — Distribution Use of System
- Charges for using the local electricity distribution network.
- Where you may see it: Supplier pricing and bills, either bundled into the unit rate or passed through.
- Why it matters: The treatment of network costs changes how quotations compare and how future cost risk is allocated.
- A useful question: Is DUoS fixed into the price or passed through at the prevailing charge?
- DC — Data Collector
- An electricity-market role that obtains and validates meter readings or interval data for settlement.
- Where you may see it: Half-hourly data arrangements, supplier records and metering appointments.
- Why it matters: Incomplete or invalid data can lead to estimated billing, weak tenders and settlement corrections.
- A useful question: Who collects the data, what is missing and how can our business receive a usable copy?
- DA — Data Aggregator
- An electricity-market role that aggregates validated consumption data for use in settlement.
- Where you may see it: Industry appointment records and technical descriptions of half-hourly supplies.
- Why it matters: It is part of the settlement chain, although it may not be a party the business deals with day to day.
- A useful question: Is the issue with collection, validation, aggregation or the supplier's use of the data?
E
- Energy supplier
- The licensed company that sells electricity or gas to the business and issues the supply bill.
- Where you may see it: Contracts, quotations, bills and account communications.
- Why it matters: The supplier is the contracting party for the energy supply; it is distinct from a broker, network operator and metering agent.
- A useful question: Who is the contracted supplier for each MPAN or MPRN, and when does that contract end?
- EAC — Estimated Annual Consumption
- An estimate of annual electricity consumption for a supply, used where a complete actual annual total is not available.
- Where you may see it: Supplier data, tenders and non-half-hourly electricity records.
- Why it matters: A tender based on an outdated estimate may misstate expected cost and volume.
- A useful question: What period and readings support this EAC, and how does it compare with recent actual use?
F
- Fixed contract
- A contract where specified price components are fixed for an agreed period; it rarely means every bill component is guaranteed unchanged.
- Where you may see it: Supplier and broker proposals.
- Why it matters: Two offers both called fixed may include different pass-through charges and risk.
- A useful question: Exactly which components are fixed, and which may still change?
- Flexible procurement
- An approach that allows energy to be purchased in portions at different times rather than fixing all volume at once.
- Where you may see it: Strategies for larger or grouped consumption portfolios.
- Why it matters: It can spread market-timing risk but requires governance, volume data and clear authority to trade.
- A useful question: Who decides when to purchase, against what mandate, and how will performance be reported?
H
- Half-hourly meter — HH meter, half hourly
- An electricity meter whose consumption is recorded in 30-minute periods for settlement and billing.
- Where you may see it: Bills, data portals and meter identifiers for many larger supplies.
- Why it matters: Interval data reveals when energy is used, supports tendering and can expose avoidable peaks.
- A useful question: Can we obtain complete interval data for every meter in a usable format?
K
- kW — kilowatt
- A measure of power: the rate at which energy is being used or produced at a moment in time.
- Where you may see it: Equipment ratings, maximum demand and generation capacity.
- Why it matters: kW helps size connections, equipment, solar and batteries; it is not the same as total consumption.
- A useful question: Is this figure an instantaneous peak, an equipment rating or a contracted limit?
- kWh — kilowatt hour
- A measure of energy consumed or generated over time.
- Where you may see it: Bills, consumption reports and generation estimates.
- Why it matters: Unit rates are commonly multiplied by kWh, making it central to annual cost and savings comparisons.
- A useful question: Is the figure actual, estimated, annualised or modelled?
- kVA — kilovolt-ampere
- A measure of apparent electrical power used in connection and capacity planning.
- Where you may see it: Capacity agreements, technical specifications and some electricity bills.
- Why it matters: It can determine available capacity and related charges, particularly at larger sites.
- A useful question: What is our agreed kVA, what peak have we reached, and is the level still appropriate?
L
- Letter of Authority — LOA
- A document allowing a broker or adviser to obtain information or take specified actions for a customer.
- Where you may see it: At the start of a broker review or procurement exercise.
- Why it matters: Its scope varies. A broad or exclusive LOA may grant more authority than a business expects.
- A useful question: What exactly may the broker do, for how long, and how can we revoke the authority?
M
- MHHS — Market-wide Half-Hourly Settlement
- The industry programme moving electricity settlement to half-hourly consumption data across the market.
- Where you may see it: Supplier communications, metering changes and industry updates.
- Why it matters: It changes how consumption data is used and may affect tariff design, meter arrangements and the value of shifting usage.
- A useful question: Will our meters, data access or pricing change, and when?
- MPAN — Meter Point Administration Number, S number
- The unique identifier for an electricity supply point; it identifies the supply, not simply the physical meter.
- Where you may see it: Electricity bills and supply contracts.
- Why it matters: Accurate MPANs are essential when tendering, switching or building a multi-site supply schedule.
- A useful question: Does our estate schedule include every MPAN and its current contract end date?
- MPRN — Meter Point Reference Number
- The unique identifier for a gas supply point.
- Where you may see it: Gas bills and supply contracts.
- Why it matters: It is the reliable key for matching a gas supply to contracts, invoices and sites.
- A useful question: Does each site and invoice map to the correct MPRN?
- MOP — Meter Operator
- An appointed organisation responsible for defined electricity meter installation, maintenance and technical services.
- Where you may see it: Metering agreements, supplier records and half-hourly supply arrangements.
- Why it matters: Meter faults, exchanges and appointment terms may sit with the MOP rather than the supplier alone.
- A useful question: Who is the appointed MOP, what services are included and when does the appointment end?
- Maximum demand — MD, peak demand
- The highest rate of electricity demand recorded for a site under a stated interval and measurement method.
- Where you may see it: Half-hourly analysis, capacity reports and some electricity bills.
- Why it matters: The peak can influence connection capacity, network charges and the case for operational changes or storage.
- A useful question: When did the peak occur, what caused it and is the measurement basis clearly stated?
- Maximum Import Capacity — MIC, agreed capacity, available capacity
- The import capacity agreed for an electricity connection, commonly expressed in kVA.
- Where you may see it: Connection agreements, network correspondence and some larger-site bills.
- Why it matters: Too little capacity can constrain operations; surplus capacity may create avoidable cost depending on the arrangement.
- A useful question: What capacity is agreed, what peak is used and what future loads are planned?
- Meter Serial Number — MSN
- The identifier printed on a physical meter; it is not the same as the MPAN or MPRN that identifies the supply point.
- Where you may see it: The meter face, bills and meter-exchange records.
- Why it matters: Checking the serial number helps confirm that a reading belongs to the physical meter installed at the site.
- A useful question: Does the serial number on the bill match the meter, and was a meter exchange recorded?
N
- Non-commodity costs
- Costs beyond the wholesale energy itself, including network, policy, balancing and other industry charges.
- Where you may see it: Price breakdowns and descriptions of fixed or pass-through offers.
- Why it matters: They make up a material part of total cost and may be treated differently across quotations.
- A useful question: Which non-commodity costs are included, fixed, forecast or passed through?
P
- Pass-through charges
- Charges billed at the amount that applies during the contract rather than fixed into the supplier's quoted rate.
- Where you may see it: Contract schedules, quotation assumptions and later invoice adjustments.
- Why it matters: A low headline rate may carry more future variability if significant elements are passed through.
- A useful question: List every pass-through item and show how it could affect the total annual cost.
- PPA — Power Purchase Agreement
- An agreement to buy electricity from a generator, often over several years and sometimes linked to on-site solar.
- Where you may see it: Solar proposals and renewable procurement strategies.
- Why it matters: A PPA can avoid upfront capital but creates long-term price, volume, property and exit commitments.
- A useful question: Who owns the equipment, what must we buy, how does price change, and what happens if we leave the site?
R
- REGO — Renewable Energy Guarantees of Origin
- A certificate used to evidence that a quantity of electricity was generated from a renewable source.
- Where you may see it: Renewable tariffs and carbon reporting evidence.
- Why it matters: A REGO is an evidence instrument; it does not by itself mean electricity physically arrived from a particular generator.
- A useful question: What environmental claim is supported, for which period and supply, and what evidence will we receive?
S
- Standing charge
- A recurring charge for keeping a supply available, usually applied per meter per day regardless of consumption.
- Where you may see it: Energy bills and supplier quotations.
- Why it matters: It can be material across a large estate or at low-consumption and vacant sites.
- A useful question: What is the annual standing-charge total across all supplies, including dormant locations?
T
- TPI — Third Party Intermediary, energy broker
- A third party that helps a customer engage with the energy market, such as a broker, consultant or comparison service.
- Where you may see it: Procurement, account management and supplier communications.
- Why it matters: TPIs have different services, supplier access, charging methods and authority; the label alone is not a quality guarantee.
- A useful question: What will you do, how are you paid, which suppliers are considered and what happens after signature?
- TNUoS — Transmission Network Use of System
- Charges associated with operating and maintaining the high-voltage electricity transmission system.
- Where you may see it: Electricity pricing and pass-through charge schedules.
- Why it matters: Its inclusion and pricing basis can affect quotation comparability and exposure to later adjustment.
- A useful question: Is TNUoS included in the rate, fixed, forecast or passed through?